Work starts at site of Canera crash: Difference between revisions
Bandit LOAF (talk | contribs) (Created page with "'''Work starts at site of Canera crash''' is a News Bulletin posted to the Commerce and Communications Network in 2790. The article denotes a 25% increase in the pric...") |
Bandit LOAF (talk | contribs) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
'''Work starts at site of Canera crash''' is a [[News Bulletin]] posted to the [[Commerce and Communications Network]] in [[2790]]. The article denotes a 25% increase in the price of [[biopolys]], [[brikcrete]], [[lumber]], [[plasteen]] and [[ | '''Work starts at site of Canera crash''' is a [[News Bulletin]] posted to the [[Commerce and Communications Network]] in [[2790]]. The article denotes a 25% increase in the price of [[biopolys]], [[brikcrete]], [[lumber]], [[plasteen]] and [[Titan]] on [[Crius]]. | ||
== | == Report == | ||
Work starts at site of Canera crash <BR> | |||
Yonda Sherdi reports from Crius <BR> | |||
Reconstruction of Linden Tower, the skyscraper destroyed last month when the freighter Canera mysteriously crashed into it, began yesterday. The project was delayed by CIS forensic teams, who have spent the last few weeks examining the site of the disaster. It is going to take at least three months to rebuild the tower, which was almost totally destroyed in the crash. Large quantities of all types of Industrial materials are required for the project, and prices on the Crian exchange reflect the demand. | |||
[[Category:News_Bulletins]] |
Latest revision as of 08:32, 3 July 2011
Work starts at site of Canera crash is a News Bulletin posted to the Commerce and Communications Network in 2790. The article denotes a 25% increase in the price of biopolys, brikcrete, lumber, plasteen and Titan on Crius.
Report
Work starts at site of Canera crash
Yonda Sherdi reports from Crius
Reconstruction of Linden Tower, the skyscraper destroyed last month when the freighter Canera mysteriously crashed into it, began yesterday. The project was delayed by CIS forensic teams, who have spent the last few weeks examining the site of the disaster. It is going to take at least three months to rebuild the tower, which was almost totally destroyed in the crash. Large quantities of all types of Industrial materials are required for the project, and prices on the Crian exchange reflect the demand.