Space port project runs into difficulty: Difference between revisions
The Terran Knowledge Bank
Bandit LOAF (talk | contribs) (→Report) |
Bandit LOAF (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
Space port project runs into difficulty <BR> | Space port project runs into difficulty <BR> | ||
Transport correspondent | Transport correspondent [name] reports <BR> | ||
The construction of a new space port for | The construction of a new space port for [planet] has foundered somewhat, following an unexpected shortage of Industrial materials. Prices have been upped considerably in an attempt to entice traders to bring more supplies. | ||
[[Category:News_Bulletins]] | [[Category:News_Bulletins]] |
Revision as of 22:20, 3 July 2011
Space port project runs into difficulty is a News Bulletin posted to the Commerce and Communications Network in 2790. The article denotes a 25% increase in the price of biopolys, brikcrete, lumber, plasteen and Titan on the specified planet.
Report
Space port project runs into difficulty
Transport correspondent [name] reports
The construction of a new space port for [planet] has foundered somewhat, following an unexpected shortage of Industrial materials. Prices have been upped considerably in an attempt to entice traders to bring more supplies.